We’ve just added a 3rd new case study to the website.
Scottish Sculpture Workshop in Huntly, Aberdeenshire, where the Guntamatic Biomass Boiler will allow savings of up 73% on their fuel costs and up 60 07% CO2, compared to the previous electric heating system.
Treco supplied and installed a top-of-the-range, fully automated 100kW Guntamatic Biocom biomass boiler system complete with a 2,000 litre thermal store, and a 7 tonne fuel store. Thermostats allow output to be closely monitored via an ECU and emissions are measured by the lambda probe in the flue. Ash from the step grate falls into a removable container.
To find out more;
http://www.treco.co.uk/case-study.php?UUID=13279315626884/