Bristol Zoo biomass boiler Installation

Tuesday, April 14th, 2009

BOILER: 2x Tatano Kalorina/E 2406 (70kW) Hot Air Machine

Bristol  Zoo contacted TRECO enquiring about the possibility of heating their ‘Butterfly House’ with a Biomass Hot Air Machine.

TRECO underwent a site survey and instructed the Zoo to construct a large enclosure reaching 8 meters high and to section off a control boiler room at either end.

Then TRECO installed the boilers, flues, ducting system and heating control system so the boiler’s would work together. However, in the event that one boiler should break down the other boiler would take over. Due to the nature of this project (being that the butterflies need heat to survive) it was imperative that this contingency plan was put in place.