Do I need planning permission for a biomass boiler?

1 minute read

Return to the article list

If you are considering installing a biomass boiler in the UK, you may be wondering whether you need planning permission. The answer to this question depends on a number of factors, including the size and location of the boiler, as well as any potential environmental impacts.

 If you are installing a small-scale biomass boiler in a residential property, you are unlikely to need planning permission, provided that the boiler meets certain criteria. These criteria include:

  •  The boiler must have a maximum heat output of 45kW
  • It must be located within the curtilage of the property (i.e. within the boundaries of the property)
  • It must not be located within a conservation area, an Area of Outstanding Natural Beauty, or a National Park
  • It must not be located on a listed building or within the curtilage of a listed building
  • It must not have a flue height exceeding 1 metre above the highest part of the roof

If your biomass boiler meets these criteria, it is classified as a 'permitted development', and you do not need to apply for planning permission.

However, if your biomass boiler exceeds these limits, or if it is located in a sensitive area, you may need to apply for planning permission. For example, if you are installing a large-scale biomass boiler in a commercial or industrial setting, you are likely to need planning permission, as the environmental impact of the boiler may be more significant.

 In addition to planning permission, you may also need to obtain other permissions and approvals, such as building regulations approval and environmental permits. These requirements will depend on the size and type of biomass boiler you are installing, as well as the location of the installation.

 It is important to consult with your local planning authority and seek professional advice before installing a biomass boiler, to ensure that you comply with all relevant regulations and requirements. Failure to obtain the necessary permissions and approvals can result in enforcement action, fines, and delays to your project.

 In conclusion, whether you need planning permission for a biomass boiler in the UK depends on a number of factors, including the size and location of the boiler, as well as any potential environmental impacts. If your biomass boiler meets certain criteria, it may be classified as a 'permitted development', and you may not need planning permission. However, if in doubt, it is always best to seek professional advice and consult with your local planning authority.

Do you have a biomass or low carbon project?

Speak to our biomass team today

01884 250790

Back to top